Liebherr LR 1750 crawler crane erecting tanks

Since 1977 · Fortaleza — Brazil

Nothing riseson its own.

For 49 years Makro has moved what Brazilian industry cannot move alone — from 40 to 1,200 tonnes, with engineered rigging plans, an owned fleet and people who have done it before.

1,200 tmaximum capacity
6locations in Brazil
49 yearsin operation
2,000+days without lost time

Engineering of Movement

Moving heavy
cargo is an
engineering
decision.

A crane is a tool. What Makro delivers is the study that comes before the lift: the load analysis, the radius calculation, the signed rigging plan, the approved route and a crew that has run the job before.

We partner with Brazil's largest industrial operations — mining, power, steel, refining and ports — from the first study to the last component in place. An owned fleet from 25 to 1,200 tonnes, six operating bases and a Remote Monitoring Centre tracking every machine in real time.

About Makro

49yearsof uninterrupted operation since 1977
1,200tonneson the LTM 11200-9.1, Brazil's longest telescopic boom
400wind turbinesunder contract — Brazil's largest order book in the sector
85thin the worldin the 2026 IC100 ranking of crane-owning companies

Solutions

Four divisions,
one operation.

Lifting and cargo handling

Makro Engenharia

Lifting and cargo handling

Cranes from 25 to 1,200 tonnes, rigging plans signed by our own engineers, and crews resident on site.

View solution
Specialised transport and indivisible loads

Makro Transporte

Specialised transport and indivisible loads

An owned fleet of tractor units and trailers for oversized cargo, with route surveys and transport permits.

View solution
Workforce management and in-plant handling

Makro Serviços

Workforce management and in-plant handling

Qualified crews, forklifts, telehandlers and gantries for logistics inside the plant.

View solution
Wind farm construction and maintenance

Makro Wind

Wind farm construction and maintenance

Brazil's largest wind farm order book, with 400 turbines under contract. Erection, major component exchange and maintenance.

View solution
Makro crane hook block against the sky
Heavy Lift · up to 1,200 t

Safety

An accident is not
bad luck. It is a decision.

More than 2,000 days without a lost-time accident across every location. That is not luck: it is the rigging plan, the work permit, the safety briefing before each shift and the right of anyone on site to stop the job.

  • Integrated management system — quality, environment and safety
  • In-house engineered rigging plan on every critical lift
  • On-board telematics and remote fleet monitoring
  • Continuous training programme for operators and riggers

Safety and compliance

Sectors

Where the load
is heavy.

Every sector has its own grammar of risk, schedule and access. Makro has worked inside all of them for nearly half a century.

01

Mining

Handling crushing, milling and conveyor equipment at mines and processing plants.

02

Petrochemicals

Erection of vessels, columns and heat exchangers; support for planned shutdowns and plant expansion.

03

Power

Thermal, hydro and wind — from initial erection to maintaining the asset in service.

04

Steel

Work inside a hot plant: blast furnace, steelmaking, rolling mill and raw material yard.

05

Refining

Critical lifts in classified areas, with an integrated rigging plan and work permit.

06

Metallurgy

Handling furnaces, ladles, moulds and process equipment.

07

Cement

Erection of rotary kilns, mills, silos and pneumatic conveying systems.

08

Pulp and paper

Erection of digesters, recovery boilers and drying lines.

09

Port operations

Onshore and offshore loading and unloading, project cargo handling and shipyard support.

Projects

What we have
already lifted.

Brazil's largest telescopic crane inside a working shopping centre

Construction — Fortaleza — Ceará

Brazil's largest telescopic crane inside a working shopping centre

Lifting the timber arches of the new façade with the Liebherr LTM 11200-9.1 — 1,200 tonnes, the longest telescopic boom in the country — over reclaimed mangrove ground.

View project
Shutdown at a pelletising plant

Mining — São Luís — Maranhão

Shutdown at a pelletising plant

A thirty-day window, forty people from the local branch and three large cranes to replace rotors, dampers and furnace ventilation ducts.

View project
Turbine erection backed by 150 rigging studies

Renewable energy — Nordeste

Turbine erection backed by 150 rigging studies

Four cranes, sections of almost 600 m³ lifted to 68 metres, and one hundred and fifty rigging studies before the first piece left the ground.

View project

View all projects

Clients

Who trusts
their load
to Makro.

Miners, steelmakers, turbine manufacturers, EPC contractors and port operators. Relationships measured in years of contract — not in number of lifts.

Talk to Makro

Got a load
nobody else
would take?

Send the drawing, the weight and the deadline. Our engineering team replies with a feasibility study, an equipment configuration and a commercial proposal.